Monday, January 29, 2018

Basement Renovation - Continued


The ripped out 'pump room' before the new wall was added behind it (left), and after the wall was added (right).  I decided to Pex and Sharkbite all the plumbing, and abandon all the old copper. The Sharkbite manifold and Pex piping are installed temporarily, prior to finalizing all specific locations.











No comments:

Post a Comment